INSP - Final | 5/9/1997 | 5/9/1997 | 5/11/1997 | P | PASS |
Alan Hauser
|
|
|
05/09/97 350 - POOL HEATER/ REINSPECTION final
|
INSP - Final | 5/9/1997 | 5/9/1997 | 5/11/1997 | P | PASS |
Alan Hauser
|
|
|
05/09/97 350 - POOL HEATER/ REINSPECTION final
|
INSP - Final | 5/8/1997 | 5/8/1997 | 5/8/1997 | P | FAIL |
Alan Hauser
|
|
|
05/08/97 350 - POOL HEATER/ WOULD LIKE AS EARLY AS POSSIBLE gas pipe undersized, pt witnessed by gas co.
|
INSP - Final | 5/8/1997 | 5/8/1997 | 5/8/1997 | P | FAIL |
Alan Hauser
|
|
|
05/08/97 350 - POOL HEATER/ WOULD LIKE AS EARLY AS POSSIBLE gas pipe undersized, pt witnessed by gas co.
|
INSP - Gas piping | 4/28/1997 | 4/28/1997 | 4/28/1997 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - gas test by gas co
|
INSP - Gas pressure test | 4/28/1997 | 4/28/1997 | 4/28/1997 | P | CANC |
Alan Hauser
|
|
|
04/28/97 350 - RETRO FOR POOL HEATER to be done by #337
|