INSP - Final | 6/9/1997 | 6/10/1997 | 6/10/1997 | A | PASS |
Jim Sly
|
|
|
06/09/97 316 -
|
INSP - Final | 6/9/1997 | 6/10/1997 | 6/10/1997 | A | PASS |
Jim Sly
|
|
|
06/09/97 316 -
|
INSP - Final | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | FAIL |
Jim Sly
|
|
|
06/05/97 316 - C/N...No access or info to get in....
|
INSP - Final | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | FAIL |
Jim Sly
|
|
|
06/05/97 316 - C/N...No access or info to get in....
|
INSP - Final | 6/2/1997 | 6/2/1997 | 6/2/1997 | P | FAIL |
Dave Lightfoot
|
|
|
06/02/97 337 - REINSPECTION lock box spi CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 6/2/1997 | 6/2/1997 | 6/2/1997 | P | FAIL |
Dave Lightfoot
|
|
|
06/02/97 337 - REINSPECTION lock box spi CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 5/29/1997 | 5/29/1997 | 5/29/1997 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 5/29/1997 | 5/29/1997 | 5/29/1997 | P | CANC |
Jim Sly
|
|
|
05/29/97 316 - Gave to Dave Lightfoot
|
INSP - Final | 5/29/1997 | 5/29/1997 | 5/29/1997 | P | CANC |
Jim Sly
|
|
|
05/29/97 316 - Gave to Dave Lightfoot
|
INSP - Framing/ Rough-in | 5/7/1997 | 5/7/1997 | 5/7/1997 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - rough in correction not made
|
INSP - Framing/ Rough-in | 5/6/1997 | 5/6/1997 | 5/7/1997 | P | CANC |
Jim Sly
|
|
|
05/06/97 316 - Gave to Alan H.
|
INSP - Rough-in & Gas Pressure | 5/5/1997 | 5/5/1997 | 5/5/1997 | P | CANC |
Jim Sly
|
|
|
05/05/97 316 - Did AM.....Cancel...
|
INSP - Rough-in & Gas Pressure | 5/5/1997 | 5/5/1997 | 5/5/1997 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N...Clearance, boots, foil..... 029434
|