Permit Number | MEC97-01131 |
Status | Finaled |
Name |
YMC INC
|
Site Address |
518 N 8TH ST
|
Project Name | |
Customer Number | |
ePlanReview | |
Description |
5/2/97-REMOVE SECTIONS OF EXISTING DUCT AND INSTALL NEW DUCT AND FAN COIL. INSTALL 2 DUCTLESS SPLIT SYSTEMS-MAIN CATHEDRAL-$47,200.00-BLD97-0719-INITIAL CERTIFICATE OF VALUE ON FILE.MPS To upgrade the HVAC system in the basement of the existing church per approved plans on file. Work to include the installation of two air conditioning units and the demo and replacement of two combustion air ducts to an exsisting boiler unit. The relocation of sprinkler line per NFPA #13 NOTE:Basement is sprinklered P.C.#154-97)RMH
|