INSP - Final | 1/15/1998 | 1/16/1998 | 1/16/1998 | A | PASS |
Dave Lightfoot
|
|
|
01/16/98 337 - ART MUSEUM--PROBLEM CALL ###-#### RICK FNL -OK FINAL sign perm occ card AS PER THE LETTER FROM GEORGE SLANE 1/15/98 THE REQEST TO ALLOW A PORTABLE LADDER FOR ROOF EQUIPMENT SERVICE IS APPROVED
|
INSP - Final | 1/15/1998 | 1/16/1998 | 1/16/1998 | A | PASS |
Dave Lightfoot
|
|
|
01/16/98 337 - ART MUSEUM--PROBLEM CALL ###-#### RICK FNL -OK FINAL sign perm occ card AS PER THE LETTER FROM GEORGE SLANE 1/15/98 THE REQEST TO ALLOW A PORTABLE LADDER FOR ROOF EQUIPMENT SERVICE IS APPROVED
|
INSP - Final | 12/29/1997 | 12/30/1997 | 12/30/1997 | A | FAIL |
Dave Lightfoot
|
|
|
12/30/97 337 - BOISE ART MUSEUM correction of 10/10/97 has not been made still need roof top ladder
|
INSP - Final | 12/29/1997 | 12/30/1997 | 12/30/1997 | A | FAIL |
Dave Lightfoot
|
|
|
12/30/97 337 - BOISE ART MUSEUM correction of 10/10/97 has not been made still need roof top ladder
|
INSP - Final | 10/8/1997 | 10/10/1997 | 10/10/1997 | A | PART |
Dave Lightfoot
|
|
|
10/10/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED signed temp occ card
|
INSP - Final | 10/8/1997 | 10/10/1997 | 10/10/1997 | A | PART |
Dave Lightfoot
|
|
|
10/10/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED signed temp occ card
|
INSP - Partial final | 8/21/1997 | 8/22/1997 | 8/22/1997 | A | PASS |
Dave Lightfoot
|
|
|
08/22/97 337 - Scheduled by Hello! on 08/21/97 at 14:48:44. class room ceiling duct work ok for cover
|
INSP - Framing/ Rough-in | 7/25/1997 | 7/28/1997 | 7/28/1997 | A | PASS |
Alan Hauser
|
|
|
07/28/97 350 - ok to cover duct in hard ceiling areas
|
INSP - Framing/ Rough-in | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | PASS |
Dave Lightfoot
|
|
|
07/01/97 337 - gallery 12 and 13 RGHN-OK ROUGH IN gallery 12 13 room n02 and n03
|
INSP - Framing/ Rough-in | 5/14/1997 | 5/15/1997 | 5/15/1997 | A | PASS |
Dave Lightfoot
|
|
|
05/15/97 337 - GIFT SHOP RGHN-OK ROUGH IN for the gift shop
|