INSP - Final | 8/1/1997 | 8/1/1997 | 8/1/1997 | P | PASS |
Alan Hauser
|
|
|
08/01/97 350 - final
|
INSP - Final | 8/1/1997 | 8/1/1997 | 8/1/1997 | P | PASS |
Alan Hauser
|
|
|
08/01/97 350 - final
|
INSP - Framing/ Rough-in | 5/29/1997 | 5/29/1997 | 5/29/1997 | | CANC |
Dave Lightfoot
|
|
|
/ / 337 - this inspection was allready done and passed
|
INSP - Rough-in & Gas Pressure | 5/29/1997 | 5/29/1997 | 5/29/1997 | P | CANC |
Jim Sly
|
|
|
05/29/97 316 - Gave to A.Hauser
|
INSP - Rough-in & Gas Pressure | 5/29/1997 | 5/29/1997 | 5/29/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - Tag 026239
|
INSP - Rough-in & Gas Pressure | 5/28/1997 | 5/28/1997 | 5/28/1997 | P | FAIL |
Alan Hauser
|
|
|
05/28/97 350 - no address, no inspection
|