INSP - Final | 8/4/1997 | 8/4/1997 | 8/4/1997 | P | PASS |
Dave Lightfoot
|
|
|
08/04/97 337 - FNL -OK FINAL
|
INSP - Final | 8/4/1997 | 8/4/1997 | 8/4/1997 | P | PASS |
Dave Lightfoot
|
|
|
08/04/97 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 6/6/1997 | 6/9/1997 | 6/9/1997 | A | PASS |
Alan Hauser
|
|
|
06/09/97 350 - Reinspection r/i ok
|
INSP - Rough-in & Gas Pressure | 6/6/1997 | 6/6/1997 | 6/6/1997 | P | PART |
Dave Lightfoot
|
|
|
06/06/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GP -OK GAS PIPING
|