INSP - Final | 10/1/1997 | 10/2/1997 | 10/2/1997 | A | PASS |
Russ Owen
|
|
|
10/02/97 407 - Scheduled by Hello! on 10/01/97 at 11:50:59.
|
INSP - Final | 10/1/1997 | 10/2/1997 | 10/2/1997 | A | PASS |
Russ Owen
|
|
|
10/02/97 407 - Scheduled by Hello! on 10/01/97 at 11:50:59.
|
INSP - Gas pressure test | 10/1/1997 | 10/2/1997 | 10/2/1997 | A | PASS |
Russ Owen
|
|
|
10/02/97 407 - Scheduled by Hello! on 10/01/97 at 11:51:25.
|
INSP - Rough-in & Gas Pressure | 6/18/1997 | 6/19/1997 | 6/19/1997 | A | PASS |
Dave Lightfoot
|
|
|
06/19/97 337 - GP -OK GAS PIPING RGHN-OK ROUGH IN
|