INSP - Final | 9/5/1997 | 9/5/1997 | 9/5/1997 | P | PASS |
Russ Owen
|
|
|
09/05/97 407 -
|
INSP - Final | 9/5/1997 | 9/5/1997 | 9/5/1997 | P | PASS |
Russ Owen
|
|
|
09/05/97 407 -
|
INSP - Final | 8/21/1997 | 8/22/1997 | 8/22/1997 | A | FAIL |
Russ Owen
|
|
|
08/22/97 407 - left correction.
|
INSP - Final | 8/21/1997 | 8/22/1997 | 8/22/1997 | A | FAIL |
Russ Owen
|
|
|
08/22/97 407 - left correction.
|
INSP - Gas pressure test | 8/21/1997 | 8/22/1997 | 8/22/1997 | A | PASS |
Russ Owen
|
|
|
08/22/97 407 - gas #34481
|
INSP - Framing/ Rough-in | 6/20/1997 | 6/23/1997 | 6/23/1997 | A | PASS |
Dave Lightfoot
|
|
|
06/23/97 337 - REINSPECTION RGHN-OK ROUGH IN
|
INSP - Rough-in & Gas Pressure | 6/19/1997 | 6/19/1997 | 6/19/1997 | P | PART |
Dave Lightfoot
|
|
|
06/19/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GP -OK GAS PIPING
|