INSP - Final | 7/25/1997 | 7/28/1997 | 7/28/1997 | A | PASS |
Alan Hauser
|
|
|
07/28/97 350 - final
|
INSP - Final | 7/25/1997 | 7/28/1997 | 7/28/1997 | A | PASS |
Alan Hauser
|
|
|
07/28/97 350 - final
|
INSP - Rough-in & Gas Pressure | 6/24/1997 | 6/24/1997 | 6/24/1997 | P | PASS |
Alan Hauser
|
|
|
06/24/97 350 - reinspection pt ok
|
INSP - Rough-in & Gas Pressure | 6/23/1997 | 6/23/1997 | 6/23/1997 | P | PART |
Alan Hauser
|
|
|
06/23/97 350 - unfinished basement r/i ok, pt failed
|