INSP - Final | 7/14/1997 | 7/15/1997 | 7/15/1997 | A | PASS |
Dave Lightfoot
|
|
|
07/15/97 337 - FNL -OK FINAL
|
INSP - Final | 7/14/1997 | 7/15/1997 | 7/15/1997 | A | PASS |
Dave Lightfoot
|
|
|
07/15/97 337 - FNL -OK FINAL
|
INSP - Rough-in & Gas Pressure | 6/26/1997 | 6/26/1997 | 6/26/1997 | P | PASS |
Dave Lightfoot
|
|
|
06/26/97 337 - reinspection RGHN-OK ROUGH IN
|
INSP - Rough-in & Gas Pressure | 6/24/1997 | 6/25/1997 | 6/25/1997 | A | PART |
Dave Lightfoot
|
|
|
06/25/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GP -OK GAS PIPING
|