INSP - Final | 10/2/1997 | 10/3/1997 | 10/6/1997 | P | PART |
Russ Owen
|
|
|
10/03/97 407 - left correction.
|
INSP - Final | 10/2/1997 | 10/3/1997 | 10/6/1997 | P | PART |
Russ Owen
|
|
|
10/03/97 407 - left correction.
|
INSP - Framing/ Rough-in | 7/24/1997 | 7/25/1997 | 7/25/1997 | A | CANC |
Alan Hauser
|
|
|
07/25/97 350 - to be done by #40? (russ)
|
INSP - Framing/ Rough-in | 7/23/1997 | 7/24/1997 | 7/24/1997 | A | FAIL |
Dave Lightfoot
|
|
|
07/24/97 337 - reinspection work not done
|
INSP - Framing/ Rough-in | 7/23/1997 | 7/23/1997 | 7/23/1997 | P | FAIL |
Dave Lightfoot
|
|
|
07/23/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Rough-in & Gas Pressure | 7/21/1997 | 7/22/1997 | 7/22/1997 | A | PART |
Dave Lightfoot
|
|
|
07/22/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GP -OK GAS PIPING
|