INSP - Final | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | PASS |
Russ Owen
|
|
|
12/23/97 407 - Scheduled by Hello!.
|
INSP - Final | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | PASS |
Russ Owen
|
|
|
12/23/97 407 - Scheduled by Hello!.
|
INSP - Gas pressure test | 10/30/1997 | 10/31/1997 | 10/31/1997 | A | PASS |
Dave Lightfoot
|
|
|
10/31/97 337 - THIS LINE IS FOR THE BBQ GP -OK GAS PIPING
|
INSP - Rough-in & Gas Pressure | 8/19/1997 | 8/19/1997 | 8/19/1997 | P | PASS |
Russ Owen
|
|
|
08/19/97 407 - re-inspection ì
|
INSP - Rough-in & Gas Pressure | 8/14/1997 | 8/15/1997 | 8/15/1997 | A | CANC |
Dave Lightfoot
|
|
|
08/15/97 337 - will be done by 407
|