INSP - Final | 9/10/1997 | 9/11/1997 | 9/11/1997 | A | PASS |
|
|
|
09/11/97 338 - FNL -OK FINAL
|
INSP - Final | 9/10/1997 | 9/11/1997 | 9/11/1997 | A | PASS |
|
|
|
09/11/97 338 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | PASS |
Alan Hauser
|
|
|
08/08/97 350 - re-inspection r/i ok ì
|
INSP - Rough-in & Gas Pressure | 8/7/1997 | 8/7/1997 | 8/7/1997 | P | PART |
Alan Hauser
|
|
|
08/07/97 350 - pt already done, no r/i corrections
|
INSP - Rough-in & Gas Pressure | 7/29/1997 | 7/30/1997 | 7/30/1997 | A | PART |
|
|
|
07/30/97 338 - 4 FIX AND FIREPLACE pt only and the attic ducting is ok t
|