INSP - Final | 8/8/1997 | 8/11/1997 | 8/11/1997 | A | PASS |
Dave Lightfoot
|
|
|
08/11/97 337 - building 24 fab 4, provide material and labor to facilita general exhast requirements of centura-450-no structural number-$4,980.0 FNL -OK FINAL
|
INSP - Final | 8/8/1997 | 8/11/1997 | 8/11/1997 | A | PASS |
Dave Lightfoot
|
|
|
08/11/97 337 - building 24 fab 4, provide material and labor to facilita general exhast requirements of centura-450-no structural number-$4,980.0 FNL -OK FINAL
|