INSP - Final | 10/23/1997 | 10/24/1997 | 10/24/1997 | A | PASS |
Russ Owen
|
|
|
10/24/97 407 - Scheduled by Hello! on 10/23/97 at 16:50:08.
|
INSP - Final | 10/23/1997 | 10/24/1997 | 10/24/1997 | A | PASS |
Russ Owen
|
|
|
10/24/97 407 - Scheduled by Hello! on 10/23/97 at 16:50:08.
|
INSP - Final | 10/23/1997 | 10/23/1997 | 10/23/1997 | P | FAIL |
Russ Owen
|
|
|
10/23/97 407 - Scheduled by Hello! on 10/23/97 at 08:18:22. left corrections
|
INSP - Final | 10/23/1997 | 10/23/1997 | 10/23/1997 | P | FAIL |
Russ Owen
|
|
|
10/23/97 407 - Scheduled by Hello! on 10/23/97 at 08:18:22. left corrections
|
INSP - Framing/ Rough-in | 9/3/1997 | 9/3/1997 | 9/3/1997 | P | CANC |
Russ Owen
|
|
|
Scheduled by Hello! on 09/03/97 at 08:40:35. Cancelled by Hello! on 09/03/97 at 09:10:16. Last update was by HLO.
|
INSP - Framing/ Rough-in | 8/27/1997 | 8/28/1997 | 8/28/1997 | A | PASS |
Russ Owen
|
|
|
08/28/97 407 - RE-INSPECTION ì
|
INSP - Rough-in & Gas Pressure | 8/25/1997 | 8/26/1997 | 8/26/1997 | A | PART |
Russ Owen
|
|
|
08/26/97 407 - after 10 a.m. re-inspection. i could never see if rough-i gas test pased 334484. still need to run separate condensate.
|
INSP - Rough-in & Gas Pressure | 8/22/1997 | 8/22/1997 | 8/25/1997 | P | FAIL |
Russ Owen
|
|
|
08/22/97 407 - reinspection
|
INSP - Gas pressure test | 8/21/1997 | 8/21/1997 | 8/21/1997 | A | FAIL |
Russ Owen
|
|
|
08/21/97 407 - left correction.
|
INSP - Rough-in & Gas Pressure | 8/20/1997 | 8/20/1997 | 8/20/1997 | P | CANC |
|
|
|
given to russ
|
INSP - Rough-in & Gas Pressure | 8/19/1997 | 8/19/1997 | 8/19/1997 | P | NR |
Russ Owen
|
|
|
08/19/97 407 - still installing will recall.
|