INSP - Final | 10/27/1997 | 10/28/1997 | 10/28/1997 | A | PASS |
Dave Lightfoot
|
|
|
10/28/97 337 - FNL -OK FINAL sign perm occ card
|
INSP - Final | 10/27/1997 | 10/28/1997 | 10/28/1997 | A | PASS |
Dave Lightfoot
|
|
|
10/28/97 337 - FNL -OK FINAL sign perm occ card
|
INSP - Final | 9/22/1997 | 9/23/1997 | 9/23/1997 | A | PASS |
Dave Lightfoot
|
|
|
09/23/97 337 - Scheduled by Hello! on 09/22/97 at 11:32:59. this inspection is for 3rd floor rough in only
|
INSP - Final | 9/22/1997 | 9/23/1997 | 9/23/1997 | A | PASS |
Dave Lightfoot
|
|
|
09/23/97 337 - Scheduled by Hello! on 09/22/97 at 11:32:59. this inspection is for 3rd floor rough in only
|
INSP - Framing/ Rough-in | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | FAIL |
Dave Lightfoot
|
|
|
09/04/97 337 - REVISE HVAC DUCTWORK AS REQUIRED BY REMODEL 3RD FLOOR N.E CORNER-BLD97-1354-$2,000.OO CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|