INSP - Final | 9/16/1997 | 9/17/1997 | 9/17/1997 | A | PASS |
Dave Lightfoot
|
|
|
09/17/97 337 - Scheduled by Hello! on 09/16/97 at 16:19:23. FNL -OK FINAL sign perm occ card
|
INSP - Final | 9/16/1997 | 9/17/1997 | 9/17/1997 | A | PASS |
Dave Lightfoot
|
|
|
09/17/97 337 - Scheduled by Hello! on 09/16/97 at 16:19:23. FNL -OK FINAL sign perm occ card
|
INSP - Final | 9/4/1997 | 9/4/1997 | 9/4/1997 | P | NR |
Dave Lightfoot
|
|
|
09/04/97 337 - DUCTWORK INSTALLED FOR HOODS-1ST FLOOR-S.SIDE-BLD97-1378- not ready need to install make up air need to permit hood
|
INSP - Final | 9/4/1997 | 9/4/1997 | 9/4/1997 | P | NR |
Dave Lightfoot
|
|
|
09/04/97 337 - DUCTWORK INSTALLED FOR HOODS-1ST FLOOR-S.SIDE-BLD97-1378- not ready need to install make up air need to permit hood
|