INSP - Final | 7/22/1999 | 7/22/1999 | 7/27/1999 | A | PART |
Alan Hauser
|
|
|
alan needs dave lightfoot to go out to see if everything is okay. okay for temp. as per phone
|
INSP - Final | 7/22/1999 | 7/22/1999 | 7/27/1999 | A | PART |
Alan Hauser
|
|
|
alan needs dave lightfoot to go out to see if everything is okay. okay for temp. as per phone
|
INSP - Final | 6/3/1999 | 6/3/1999 | 6/3/1999 | | PART |
Dave Lightfoot
|
|
|
06/03/99 337 - kitchen dining area ok
|
INSP - Final | 6/3/1999 | 6/3/1999 | 6/3/1999 | | PART |
Dave Lightfoot
|
|
|
06/03/99 337 - kitchen dining area ok
|
INSP - Final | 6/2/1999 | 6/3/1999 | 6/3/1999 | A | PART |
Dave Lightfoot
|
|
|
06/03/99 337 - part ok
|
INSP - Final | 6/2/1999 | 6/3/1999 | 6/3/1999 | A | PART |
Dave Lightfoot
|
|
|
06/03/99 337 - part ok
|
INSP - Final | 1/27/1999 | 1/27/1999 | 1/27/1999 | P | PART |
Dave Lightfoot
|
|
|
01/27/99 337 - clearance in hood exhaust shaft ok to exhaust duct
|
INSP - Final | 1/27/1999 | 1/27/1999 | 1/27/1999 | P | PART |
Dave Lightfoot
|
|
|
01/27/99 337 - clearance in hood exhaust shaft ok to exhaust duct
|
INSP - Conference | 12/9/1998 | 12/9/1998 | 12/9/1998 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - conference on hood exhaust duct shaft
|
INSP - Final | 11/1/1998 | 11/1/1998 | 11/1/1998 | | CANC |
Alan Hauser
|
|
|
10/28/98 350 - to be done by #337
|
INSP - Final | 11/1/1998 | 11/1/1998 | 11/1/1998 | | CANC |
Alan Hauser
|
|
|
10/28/98 350 - to be done by #337
|
INSP - Final | 10/29/1998 | 10/29/1998 | 10/29/1998 | P | PART |
Dave Lightfoot
|
|
|
10/29/98 337 - ###-#### partial final 2nd fl air handler kit hoods ok
|
INSP - Final | 10/29/1998 | 10/29/1998 | 10/29/1998 | P | PART |
Dave Lightfoot
|
|
|
10/29/98 337 - ###-#### partial final 2nd fl air handler kit hoods ok
|
INSP - Final | 9/16/1998 | 9/17/1998 | 9/17/1998 | A | PART |
Dave Lightfoot
|
|
|
09/17/98 337 - Scheduled by Hello!. Contact phone is [3842032]. hood insulating only
|
INSP - Final | 9/16/1998 | 9/17/1998 | 9/17/1998 | A | PART |
Dave Lightfoot
|
|
|
09/17/98 337 - Scheduled by Hello!. Contact phone is [3842032]. hood insulating only
|
INSP - Final | 9/14/1998 | 9/15/1998 | 9/15/1998 | A | PASS |
Dave Lightfoot
|
|
|
09/15/98 337 - Scheduled by Hello!. Contact phone is [3842032]. FNL -OK FINAL 1st floor areas signj card
|
INSP - Final | 9/14/1998 | 9/15/1998 | 9/15/1998 | A | PASS |
Dave Lightfoot
|
|
|
09/15/98 337 - Scheduled by Hello!. Contact phone is [3842032]. FNL -OK FINAL 1st floor areas signj card
|
INSP - Framing/ Rough-in | 9/15/1998 | 9/15/1998 | 9/15/1998 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - 2nd floor north side r/i ok
|
INSP - Final | 8/25/1998 | 8/26/1998 | 8/26/1998 | P | PART |
Dave Lightfoot
|
|
|
08/26/98 337 - Scheduled by Hello!. Contact phone is [3842032]. 2 type one hoods
|
INSP - Final | 8/25/1998 | 8/26/1998 | 8/26/1998 | P | PART |
Dave Lightfoot
|
|
|
08/26/98 337 - Scheduled by Hello!. Contact phone is [3842032]. 2 type one hoods
|
INSP - Framing/ Rough-in | 7/9/1998 | 7/10/1998 | 7/10/1998 | A | PART |
Dave Lightfoot
|
|
|
07/10/98 37 - Scheduled by Hello!. Contact phone is [3842032]. partial r/i
|
INSP - Final | 6/23/1998 | 6/24/1998 | 6/24/1998 | A | PART |
Dave Lightfoot
|
|
|
06/24/98 337 - Scheduled by Hello!. Contact phone is [3842510]. partial final ok 1st floor lobby
|
INSP - Final | 6/23/1998 | 6/24/1998 | 6/24/1998 | A | PART |
Dave Lightfoot
|
|
|
06/24/98 337 - Scheduled by Hello!. Contact phone is [3842510]. partial final ok 1st floor lobby
|
INSP - Final | 5/7/1998 | 5/8/1998 | 5/8/1998 | A | PART |
Dave Lightfoot
|
|
|
05/08/98 337 - Scheduled by Hello!. Contact phone is [3842032]. partial r/i 1st floor D I area
|
INSP - Final | 5/7/1998 | 5/8/1998 | 5/8/1998 | A | PART |
Dave Lightfoot
|
|
|
05/08/98 337 - Scheduled by Hello!. Contact phone is [3842032]. partial r/i 1st floor D I area
|
INSP - Framing/ Rough-in | 4/9/1998 | 4/13/1998 | 4/13/1998 | A | PART |
Dave Lightfoot
|
|
|
04/13/98 337 - Scheduled by Hello!. Contact phone is [3842032]. 1st floor main corridor ok for temp occ
|
INSP - Final | 3/20/1998 | 3/23/1998 | 3/23/1998 | A | PART |
Dave Lightfoot
|
|
|
03/23/98 337 - BLDG 17C--PARTIAL FINAL--LIBRARY--JOHN PAGER ###-#### library and training room part final 0k
|
INSP - Final | 3/20/1998 | 3/23/1998 | 3/23/1998 | A | PART |
Dave Lightfoot
|
|
|
03/23/98 337 - BLDG 17C--PARTIAL FINAL--LIBRARY--JOHN PAGER ###-#### library and training room part final 0k
|
INSP - Final | 2/23/1998 | 2/24/1998 | 2/24/1998 | P | PART |
Dave Lightfoot
|
|
|
02/24/98 337 - JOHN SCHEDULED THIS WITH YOU FOR 2:00--BLDG 17C--PAGER 38 JIM STORY IS INVITED ALSO??--PARTIAL FINAL this is only a conference on the kitchen hood
|
INSP - Final | 2/23/1998 | 2/24/1998 | 2/24/1998 | P | PART |
Dave Lightfoot
|
|
|
02/24/98 337 - JOHN SCHEDULED THIS WITH YOU FOR 2:00--BLDG 17C--PAGER 38 JIM STORY IS INVITED ALSO??--PARTIAL FINAL this is only a conference on the kitchen hood
|
INSP - Final | 1/13/1998 | 1/15/1998 | 1/15/1998 | A | PART |
Dave Lightfoot
|
|
|
01/15/98 337 - call John ###-#### bld 17-c Bridge Link final partial final ok
|
INSP - Final | 1/13/1998 | 1/15/1998 | 1/15/1998 | A | PART |
Dave Lightfoot
|
|
|
01/15/98 337 - call John ###-#### bld 17-c Bridge Link final partial final ok
|
INSP - Framing/ Rough-in | 1/14/1998 | 1/14/1998 | 1/14/1998 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - part rough in 2nd floor bridge link
|
INSP - Partial final | 12/12/1997 | 12/12/1997 | 12/12/1997 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - for break room area 2nd floor
|
INSP - Partial final | 11/14/1997 | 11/14/1997 | 11/14/1997 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - sign temp occ card for part of 2nd floor
|
INSP - Partial final | 11/13/1997 | 11/13/1997 | 11/13/1997 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need smoke detectors installed in air handler equip
|
INSP - Final | 11/12/1997 | 11/12/1997 | 11/12/1997 | | PART |
Dave Lightfoot
|
|
|
PARTIAL SIGNED OCC CARD / / 337 - sign temp occ card ok
|
INSP - Partial final | 11/4/1997 | 11/6/1997 | 11/6/1997 | A | PASS |
Dave Lightfoot
|
|
|
11/06/97 337 - second floor temp occ. temp occ ok
|
INSP - Framing/ Rough-in | 10/22/1997 | 10/27/1997 | 10/27/1997 | A | PASS |
Dave Lightfoot
|
|
|
10/27/97 337 - second floor RGHN-OK ROUGH IN office area and corridors 2nd fl air handler
|
INSP - Conference | 10/22/1997 | 10/22/1997 | 10/22/1997 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - CONFERENCE ON FIRE DAMPERS
|
INSP - Conference | 10/21/1997 | 10/21/1997 | 10/21/1997 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - corridor openings need to be protected
|
INSP - Conference | 10/1/1997 | 10/1/1997 | 10/1/1997 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - conference ok
|
INSP - Conference | 9/29/1997 | 9/29/1997 | 9/29/1997 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - 17 c stairwells air
|
INSP - Framing/ Rough-in | 9/19/1997 | 9/22/1997 | 9/22/1997 | A | PASS |
Dave Lightfoot
|
|
|
09/22/97 337 - mic. #17 conference only
|
INSP - Framing/ Rough-in | 9/18/1997 | 9/18/1997 | 9/18/1997 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - partial rough in 2nd fl 17c
|
INSP - Framing/ Rough-in | 9/17/1997 | 9/18/1997 | 9/17/1997 | A | |
Dave Lightfoot
|
|
|
09/17/97 337 - 2ND FLOOR MIC #17C CONTACT: JOHN MCBRIDE ###-#### PAGER
|