INSP - Final | 10/29/1997 | 10/29/1997 | 10/29/1997 | P | FAIL |
|
|
|
10/29/97 333 - no access
|
INSP - Final | 10/29/1997 | 10/29/1997 | 10/29/1997 | P | FAIL |
|
|
|
10/29/97 333 - no access
|
INSP - Framing/ Rough-in | 10/1/1997 | 10/1/1997 | 10/1/1997 | P | PASS |
Wes Worcester
|
|
|
verify min R-6 insulation at exposed metal ducting and plenum in attic and garage
|
INSP - Gas pressure test | 9/30/1997 | 9/30/1997 | 9/30/1997 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Rough-in & Gas Pressure | 9/29/1997 | 9/30/1997 | 9/30/1997 | A | NR |
Wes Worcester
|
|
|
not finished w/ducts...gas pressure ok
|