INSP - Final | 11/24/1997 | 11/25/1997 | 11/25/1997 | A | PASS |
Russ Owen
|
|
|
REINSPECTION
|
INSP - Final | 11/24/1997 | 11/25/1997 | 11/25/1997 | A | PASS |
Russ Owen
|
|
|
REINSPECTION
|
INSP - Final | 11/21/1997 | 11/21/1997 | 11/21/1997 | P | FAIL |
Russ Owen
|
|
|
LEFT CORRECTIONS.
|
INSP - Final | 11/21/1997 | 11/21/1997 | 11/21/1997 | P | FAIL |
Russ Owen
|
|
|
LEFT CORRECTIONS.
|
INSP - Framing/ Rough-in | 10/1/1997 | 10/2/1997 | 10/2/1997 | A | PASS |
Russ Owen
|
|
|
10/02/97 407 - Scheduled by Hello! on 10/01/97 at 12:21:21. did inspection. 10/1/97
|
INSP - Gas log/ Fireplace | 9/29/1997 | 9/30/1997 | 10/1/1997 | P | PASS |
Russ Owen
|
|
|
09/30/97 407 - 2 F/P ,only one gas stove at time of insp.
|
INSP - Rough-in & Gas Pressure | 9/29/1997 | 9/30/1997 | 10/1/1997 | P | PART |
Russ Owen
|
|
|
09/30/97 407 - left corrections.
|