INSP - Final | 1/29/1998 | 1/30/1998 | 1/31/1998 | P | PASS |
|
|
|
01/30/98 338 - ###-#### FNL -OK FINAL
|
INSP - Final | 1/29/1998 | 1/30/1998 | 1/31/1998 | P | PASS |
|
|
|
01/30/98 338 - ###-#### FNL -OK FINAL
|
INSP - Framing/ Rough-in | 11/7/1997 | 11/7/1997 | 11/7/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - r/i ok
|
INSP - Gas pressure test | 11/7/1997 | 11/7/1997 | 11/7/1997 | P | PASS |
Alan Hauser
|
|
|
11/07/97 350 - REINSPECTION pt ok
|
INSP - Rough-in & Gas Pressure | 10/1/1997 | 10/1/1997 | 10/1/1997 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - pt failed, r/i need fans hooked up
|
INSP - Rough-in & Gas Pressure | 10/1/1997 | 10/1/1997 | 10/1/1997 | P | PASS |
Alan Hauser
|
|
|
10/01/97 350 - already done in a.m.
|