INSP - Final | 10/13/1997 | 10/13/1997 | 10/13/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - pt by gas co., final on roof top unit, final
|
INSP - Final | 10/13/1997 | 10/13/1997 | 10/13/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - pt by gas co., final on roof top unit, final
|
INSP - Final | 10/6/1997 | 10/6/1997 | 10/6/1997 | P | FAIL |
Alan Hauser
|
|
|
10/06/97 350 - ROOF-TOP UNIT no final, gas pipe corrections ì
|
INSP - Final | 10/6/1997 | 10/6/1997 | 10/6/1997 | P | FAIL |
Alan Hauser
|
|
|
10/06/97 350 - ROOF-TOP UNIT no final, gas pipe corrections ì
|
INSP - Framing/ Rough-in | 10/6/1997 | 10/6/1997 | 10/6/1997 | P | FAIL |
Alan Hauser
|
|
|
10/06/97 350 - gas piping undersized from old boiler room to new r.t.u a roof.
|