INSP - Final | 2/17/1998 | 2/17/1998 | 2/17/1998 | P | PASS |
Dave Lightfoot
|
|
|
02/17/98 337 - partial final North end of First Floor debbie ###-#### final whole bldg shell core permit sign perm occ card
|
INSP - Final | 2/17/1998 | 2/17/1998 | 2/17/1998 | P | PASS |
Dave Lightfoot
|
|
|
02/17/98 337 - partial final North end of First Floor debbie ###-#### final whole bldg shell core permit sign perm occ card
|
INSP - Framing/ Rough-in | 2/12/1998 | 2/13/1998 | 2/13/1998 | A | PASS |
Dave Lightfoot
|
|
|
02/13/98 337 - DEBBIE ###-#### REINSPECTION partial r/i ok
|
INSP - Framing/ Rough-in | 2/9/1998 | 2/9/1998 | 2/9/1998 | P | NR |
Dave Lightfoot
|
|
|
02/09/98 337 - pat 342-506 drop ceiling tile. not ready
|
INSP - Framing/ Rough-in | 2/4/1998 | 2/5/1998 | 2/5/1998 | P | FAIL |
Dave Lightfoot
|
|
|
02/05/98 337 - THIS IS FOR 1/2 OF THE 2ND FLOOR--ROBIN ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 2/3/1998 | 2/4/1998 | 2/4/1998 | A | CANC |
Dave Lightfoot
|
|
|
02/04/98 337 - WANTS PARTIAL FINAL FOR CEILING ON 2ND FLOOR--ROBIN 342-6 not ready
|
INSP - Final | 2/3/1998 | 2/4/1998 | 2/4/1998 | A | CANC |
Dave Lightfoot
|
|
|
02/04/98 337 - WANTS PARTIAL FINAL FOR CEILING ON 2ND FLOOR--ROBIN 342-6 not ready
|
INSP - Framing/ Rough-in | 2/3/1998 | 2/4/1998 | 2/4/1998 | A | CANC |
Dave Lightfoot
|
|
|
02/04/98 337 - ROBIN ###-#### FOR ANY PROBLEMS not ready
|
INSP - Framing/ Rough-in | 12/4/1997 | 12/5/1997 | 12/5/1997 | A | PASS |
Alan Hauser
|
|
|
12/05/97 350 - FIRE SHAFT r/i ok for two shafts
|