INSP - Final | 11/13/1997 | 11/14/1997 | 11/14/1997 | A | PASS |
Alan Hauser
|
|
|
11/14/97 350 - final, signed final occ. card
|
INSP - Final | 11/13/1997 | 11/14/1997 | 11/14/1997 | A | PASS |
Alan Hauser
|
|
|
11/14/97 350 - final, signed final occ. card
|
INSP - Framing/ Rough-in | 10/29/1997 | 10/29/1997 | 10/29/1997 | P | PASS |
Alan Hauser
|
|
|
10/29/97 350 - Scheduled by Hello! on 10/29/97 at 08:15:12. r/i corrections made as per engineer, r/i ok
|
INSP - Retro Fit (check note) | 10/20/1997 | 10/21/1997 | 10/21/1997 | A | FAIL |
Alan Hauser
|
|
|
10/21/97 350 - Scheduled by Hello! on 10/20/97 at 14:54:32. no r/i, hvac work not as plans, need eng. approval
|