INSP - Final | 3/30/1998 | 3/30/1998 | 3/30/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - pt ok for tire store, final
|
INSP - Final | 3/30/1998 | 3/30/1998 | 3/30/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - pt ok for tire store, final
|
INSP - Framing/ Rough-in | 1/21/1998 | 1/22/1998 | 1/22/1998 | A | NR |
Alan Hauser
|
|
|
01/22/98 350 - GAS TEST\\ CRAIG ###-####\THIS IS FOR COSTCO not ready, check later
|
INSP - Gas pressure test | 1/22/1998 | 1/22/1998 | 1/22/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - pt ok, held 60# for 30 min.
|
INSP - Final | 12/11/1997 | 12/12/1997 | 12/12/1997 | A | PART |
Alan Hauser
|
|
|
12/12/97 350 - gas piping correction fixed, final
|
INSP - Final | 12/11/1997 | 12/12/1997 | 12/12/1997 | A | PART |
Alan Hauser
|
|
|
12/12/97 350 - gas piping correction fixed, final
|
INSP - Gas pressure test | 12/4/1997 | 12/5/1997 | 12/5/1997 | A | PASS |
Alan Hauser
|
|
|
12/05/97 350 - costco\\she wants this at 9:00am\\I told her to call you pt ok for gasline, final
|