INSP - Final | 1/7/1998 | 1/8/1998 | 1/8/1998 | A | PASS |
Dave Lightfoot
|
|
|
01/08/98 337 - Scheduled by Hello!. FNL -OK FINAL sign perm occ card
|
INSP - Final | 1/7/1998 | 1/8/1998 | 1/8/1998 | A | PASS |
Dave Lightfoot
|
|
|
01/08/98 337 - Scheduled by Hello!. FNL -OK FINAL sign perm occ card
|
INSP - Gas pressure test | 12/10/1997 | 12/11/1997 | 12/11/1997 | A | PASS |
Dave Lightfoot
|
|
|
12/11/97 337 - rein this gas test passed 12/10/97
|
INSP - Gas pressure test | 12/10/1997 | 12/10/1997 | 12/10/1997 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - GP -OK GAS PIPING
|
INSP - Gas pressure test | 12/3/1997 | 12/4/1997 | 12/4/1997 | A | FAIL |
Dave Lightfoot
|
|
|
12/04/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 12/3/1997 | 12/3/1997 | 12/3/1997 | P | PASS |
Dave Lightfoot
|
|
|
12/03/97 337 - Scheduled by Hello! on 12/03/97 at 10:11:35. RGHN-OK ROUGH IN
|