INSP - Final | 2/10/1998 | 2/11/1998 | 2/11/1998 | A | PASS |
Tom Arcoraci
|
|
|
02/11/98 408 - carol ###-#### final
|
INSP - Final | 2/10/1998 | 2/11/1998 | 2/11/1998 | A | PASS |
Tom Arcoraci
|
|
|
02/11/98 408 - carol ###-#### final
|
INSP - Framing/ Rough-in | 12/9/1997 | 12/10/1997 | 12/10/1997 | A | PASS |
Jim Sly
|
|
|
12/09/97 316 - Reinspect...OK on 12/09/97 at 17:00:39.
|
INSP - Rough-in & Gas Pressure | 12/8/1997 | 12/9/1997 | 12/9/1997 | A | FAIL |
Alan Hauser
|
|
|
12/09/97 350 - $42 reinspection fee, corrections not fixed
|
INSP - Rough-in & Gas Pressure | 12/5/1997 | 12/8/1997 | 12/8/1997 | P | PART |
Alan Hauser
|
|
|
12/08/97 350 - pt ok, no r/i, corrections posted
|