INSP - Final | 2/9/1998 | 2/9/1998 | 2/9/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final, signed final occ. card
|
INSP - Final | 2/9/1998 | 2/9/1998 | 2/9/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final, signed final occ. card
|
INSP - Framing/ Rough-in | 2/9/1998 | 2/9/1998 | 2/9/1998 | P | PASS |
Alan Hauser
|
|
|
02/09/98 350 - brandon ###-#### truck system, defusers, etc. r/i ok
|
INSP - Framing/ Rough-in | 1/26/1998 | 1/27/1998 | 1/27/1998 | A | PART |
Alan Hauser
|
|
|
BLACK EAGLE #4--BRANDON AT ###-#### part. r/i for west end
|
INSP - Framing/ Rough-in | 1/14/1998 | 1/15/1998 | 1/15/1998 | A | PART |
Alan Hauser
|
|
|
01/15/98 350 - r/i ok for area north of corridor only, full length of bu
|