INSP - Final | 1/26/1998 | 1/26/1998 | 1/26/1998 | P | PASS |
Dave Lightfoot
|
|
|
01/26/98 337 - ###-#### FNL -OK FINAL
|
INSP - Final | 1/26/1998 | 1/26/1998 | 1/26/1998 | P | PASS |
Dave Lightfoot
|
|
|
01/26/98 337 - ###-#### FNL -OK FINAL
|
INSP - Rough-in & Gas Pressure | 12/30/1997 | 12/30/1997 | 12/30/1997 | P | PASS |
Dave Lightfoot
|
|
|
12/30/97 337 - reinspection GP -OK GAS PIPING RGHN-OK ROUGH IN
|
INSP - Rough-in & Gas Pressure | 12/23/1997 | 12/24/1997 | 12/24/1997 | A | FAIL |
Dave Lightfoot
|
|
|
12/24/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|