INSP - Final | 6/12/1998 | 6/12/1998 | 6/12/1998 | P | PASS |
Dave Lightfoot
|
|
|
06/12/98 337 - EXXON TIGER MART--KENT ###-#### FNL -OK FINAL sign card
|
INSP - Final | 6/12/1998 | 6/12/1998 | 6/12/1998 | P | PASS |
Dave Lightfoot
|
|
|
06/12/98 337 - EXXON TIGER MART--KENT ###-#### FNL -OK FINAL sign card
|
INSP - Partial final | 3/20/1998 | 3/20/1998 | 3/20/1998 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - sign temp occ card still need a perm roof ladder
|
INSP - Final | 3/18/1998 | 3/19/1998 | 3/19/1998 | A | FAIL |
Dave Lightfoot
|
|
|
03/19/98 337 - Scheduled by Hello!. Contact phone is [3426506]. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need rooftop equipment access
|
INSP - Final | 3/18/1998 | 3/19/1998 | 3/19/1998 | A | FAIL |
Dave Lightfoot
|
|
|
03/19/98 337 - Scheduled by Hello!. Contact phone is [3426506]. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need rooftop equipment access
|
INSP - Gas pressure test | 1/7/1998 | 1/8/1998 | 1/8/1998 | A | PASS |
Dave Lightfoot
|
|
|
01/08/98 337 - GP -OK GAS PIPING
|
INSP - Framing/ Rough-in | 1/7/1998 | 1/7/1998 | 1/7/1998 | P | PASS |
Dave Lightfoot
|
|
|
01/07/98 337 - REINSPECTION TO COVER RGHN-OK ROUGH IN
|
INSP - Framing/ Rough-in | 1/7/1998 | 1/7/1998 | 1/7/1998 | | PASS |
Alan Hauser
|
|
|
01/07/98 350 - already done by #337
|
INSP - Conference | 12/31/1997 | 12/31/1997 | 12/31/1997 | A | PASS |
Carl Dependahl
|
|
|
TRAN INSP FROM TOM TO ALAN PER GS
|
INSP - Framing/ Rough-in | 12/30/1997 | 12/31/1997 | 12/31/1997 | A | CANC |
Tom Arcoraci
|
|
|
GAVE TO 350 THIS IS COMMERICAL
|
INSP - Framing/ Rough-in | 12/31/1997 | 12/31/1997 | 12/31/1997 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - no r/i, corrections posted on front door
|
INSP - Framing/ Rough-in | 12/31/1997 | 12/31/1997 | 12/31/1997 | A | FAIL |
Alan Hauser
|
|
|
12/31/97 350 - TRAN FROM TOM A. PER GEORGE; 340, THANKS AL. HAPPY NEW YE no r/i, corrections posted on front door
|