INSP - Framing/ Rough-in | 4/16/1999 | 4/16/1999 | 4/16/1999 | | PASS |
Alan Hauser
|
|
|
/ / 350 -
|
INSP - Framing/ Rough-in | 4/16/1999 | 4/16/1999 | 4/16/1999 | | PASS |
Alan Hauser
|
|
|
/ / 350 -
|
INSP - Final | 4/15/1999 | 4/15/1999 | 4/15/1999 | P | PASS |
Alan Hauser
|
|
|
04/15/99 350 - For the Chuck A Rama!
|
INSP - Final | 4/15/1999 | 4/15/1999 | 4/15/1999 | P | PASS |
Alan Hauser
|
|
|
04/15/99 350 - For the Chuck A Rama!
|
INSP - Framing/ Rough-in | 5/19/1998 | 5/19/1998 | 5/19/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - pt ok, gas piping as per engineers revised drawing for a 5#
|
INSP - Framing/ Rough-in | 5/19/1998 | 5/19/1998 | 5/19/1998 | P | PART |
Alan Hauser
|
|
|
05/19/98 350 - late p.m. john ###-#### will check in a.m., to see if they are ready then
|