INSP - Final | 1/15/1998 | 1/16/1998 | 1/16/1998 | A | FAIL |
Dave Lightfoot
|
|
|
01/16/98 337 - Josh ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ì
|
INSP - Final | 1/15/1998 | 1/16/1998 | 1/16/1998 | A | FAIL |
Dave Lightfoot
|
|
|
01/16/98 337 - Josh ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ì
|
INSP - Final | 1/16/1998 | 1/16/1998 | 1/16/1998 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - FNL -OK FINAL
|
INSP - Final | 1/12/1998 | 1/14/1998 | 1/14/1998 | A | NR |
Dave Lightfoot
|
|
|
01/14/98 337 - REPLACE BOILER AT PRECISION PROPELLER--CONTACT BRIAN AT 3 not ready
|
INSP - Final | 1/12/1998 | 1/14/1998 | 1/14/1998 | A | NR |
Dave Lightfoot
|
|
|
01/14/98 337 - REPLACE BOILER AT PRECISION PROPELLER--CONTACT BRIAN AT 3 not ready
|