INSP - Final | 6/1/1998 | 6/1/1998 | 6/1/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - thought this might be for a final, but building is locked
|
INSP - Final | 6/1/1998 | 6/1/1998 | 6/1/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - thought this might be for a final, but building is locked
|
INSP - Final | 6/1/1998 | 6/1/1998 | 6/1/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - got back in, final
|
INSP - Final | 6/1/1998 | 6/1/1998 | 6/1/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - got back in, final
|
INSP - Framing/ Rough-in | 6/1/1998 | 6/1/1998 | 6/1/1998 | | PASS |
Alan Hauser
|
|
|
06/01/98 350 - this r/i was done on 1/30/98
|
INSP - Final | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PASS |
Alan Hauser
|
|
|
05/04/98 350 -
|
INSP - Final | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PASS |
Alan Hauser
|
|
|
05/04/98 350 -
|
INSP - Final | 4/28/1998 | 4/28/1998 | 4/28/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - not ready, no electricity to range hood
|
INSP - Final | 4/28/1998 | 4/28/1998 | 4/28/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - not ready, no electricity to range hood
|
INSP - Final | 4/23/1998 | 4/27/1998 | 4/27/1998 | A | CANC |
Jim Sly
|
|
|
04/27/98 316 - Done by Alan H.
|
INSP - Final | 4/27/1998 | 4/27/1998 | 4/27/1998 | P | CANC |
Dave Lightfoot
|
|
|
04/27/98 337 - Final will be done 350 4/28/98
|
INSP - Final | 4/23/1998 | 4/27/1998 | 4/27/1998 | A | CANC |
Jim Sly
|
|
|
04/27/98 316 - Done by Alan H.
|
INSP - Final | 4/27/1998 | 4/27/1998 | 4/27/1998 | P | CANC |
Dave Lightfoot
|
|
|
04/27/98 337 - Final will be done 350 4/28/98
|
INSP - Framing/ Rough-in | 1/30/1998 | 1/30/1998 | 1/30/1998 | P | PASS |
Alan Hauser
|
|
|
01/30/98 350 - r/i ok, 8 dryers, 4 28'3 elb., 4 17'1 elb.
|
INSP - Rough-in & Gas Pressure | 1/29/1998 | 1/30/1998 | 1/30/1998 | A | FAIL |
Alan Hauser
|
|
|
01/30/98 350 - benton ###-#### as close to 11:00 as possible not ready
|
INSP - Framing/ Rough-in | 1/28/1998 | 1/29/1998 | 1/29/1998 | A | NR |
Alan Hauser
|
|
|
01/29/98 350 - ###-#### not ready
|