Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberMEC98-00448
StatusFinaled
Name HOBSON FABRICATING CORPORATION
Site Address 370 N MILWAUKEE ST
Project NameBTS - THE BON MARCHE
Customer Number 
ePlanReview 
Description
2-12-98 HVAC PER BLD97-3096. INSIDE FINISH OF SHELL (BON MARCHE). INITIAL CERTIFICATE OF VALUE IS $207,120.00 DF JOB #4051 JOB #97-162 8/3/98-additional job value of $85,761.00-for a total of 292,881.00-final certificate of value.mps
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final7/21/19987/22/19987/22/1998APASS
DetailsAlan Hauser
07/22/98 350 - final
INSP - Final7/21/19987/22/19987/22/1998APASS
DetailsAlan Hauser
07/22/98 350 - final
INSP - Final7/21/19987/21/19987/21/1998PCANC
DetailsDave Lightfoot
07/21/98 337 - Scheduled by Hello!. Contact phone is [3435423]. called and canceled
INSP - Final7/21/19987/21/19987/21/1998PCANC
DetailsDave Lightfoot
07/21/98 337 - Scheduled by Hello!. Contact phone is [3435423]. called and canceled
INSP - Final6/29/19986/30/19986/30/1998APART
DetailsAlan Hauser
06/30/98 350 -
INSP - Final6/29/19986/30/19986/30/1998APART
DetailsAlan Hauser
06/30/98 350 -
INSP - Final6/1/19986/2/19986/2/1998APART
DetailsAlan Hauser
06/02/98 350 - signed temp. card
INSP - Final6/1/19986/2/19986/2/1998APART
DetailsAlan Hauser
06/02/98 350 - signed temp. card
INSP - Final5/13/19985/14/19985/14/1998APART
DetailsAlan Hauser
05/14/98 350 - stop yesterday and signed temp. final, phase 3
INSP - Final5/13/19985/14/19985/14/1998APART
DetailsAlan Hauser
05/14/98 350 - stop yesterday and signed temp. final, phase 3
INSP - Framing/ Rough-in5/14/19985/14/19985/14/1998PCANC
DetailsAlan Hauser
Scheduled by Hello!. Contact phone is [3842171]. Cancelled by Hello! (Last update by [HLO]). Contact: [3435423].
INSP - Final5/13/19985/13/19985/13/1998 PART
DetailsAlan Hauser
/ / 350 - signed temp. final for phase 3
INSP - Final5/13/19985/13/19985/13/1998 PART
DetailsAlan Hauser
/ / 350 - signed temp. final for phase 3
INSP - Final4/29/19984/29/19984/29/1998PPART
DetailsAlan Hauser
04/29/98 350 - temp. final, signed temp occ card
INSP - Final4/29/19984/29/19984/29/1998PPART
DetailsAlan Hauser
04/29/98 350 - temp. final, signed temp occ card
INSP - Final4/20/19984/21/19984/22/1998PPART
DetailsAlan Hauser
04/22/98 350 - had done this other day, area 2
INSP - Final4/20/19984/21/19984/22/1998PPART
DetailsAlan Hauser
04/22/98 350 - had done this other day, area 2
INSP - Final4/10/19984/13/19984/13/1998PFAIL
DetailsAlan Hauser
04/13/98 350 - couldn't find jon or jack on site to ask what this was fo
INSP - Final4/10/19984/13/19984/13/1998PFAIL
DetailsAlan Hauser
04/13/98 350 - couldn't find jon or jack on site to ask what this was fo
INSP - Final3/27/19983/27/19983/27/1998 PART
DetailsAlan Hauser
/ / 350 - temp. final, still corrections on generator room unit heater disconnected from gas at present
INSP - Final3/27/19983/27/19983/27/1998 PART
DetailsAlan Hauser
/ / 350 - temp. final, still corrections on generator room unit heater disconnected from gas at present
INSP - Final3/25/19983/26/19983/26/1998AFAIL
DetailsAlan Hauser
03/26/98 350 - no temp., left corrections with supt.
INSP - Final3/25/19983/26/19983/26/1998AFAIL
DetailsAlan Hauser
03/26/98 350 - no temp., left corrections with supt.
INSP - Framing/ Rough-in2/11/19982/11/19982/11/1998PPASS
DetailsAlan Hauser
02/11/98 350 - INSIDE FINISH OF BON MARCHE SHELL--BLD97-3096--RANDY 343- r/i ok for all duct above ceiling, no grid yet