INSP - Framing/ Rough-in | 3/3/1998 | 3/3/1998 | 3/3/1998 | P | PASS |
Russ Owen
|
|
|
i have a letter from stove company approving this installation flex pipe and horizontal run etc.this installation also has inspection request add into framing inspection BLD,S. I have had a lot of time in compliance.
|
INSP - Gas log/ Fireplace | 3/3/1998 | 3/3/1998 | 3/3/1998 | A | FAIL |
Russ Owen
|
|
|
/ / 407 - re-insp. need more clearance.
|
INSP - Final | 2/26/1998 | 2/26/1998 | 2/26/1998 | P | FAIL |
Russ Owen
|
|
|
waiting for marco to approve liner also need additional clearance.i have called and talked with besco.
|
INSP - Final | 2/26/1998 | 2/26/1998 | 2/26/1998 | P | FAIL |
Russ Owen
|
|
|
waiting for marco to approve liner also need additional clearance.i have called and talked with besco.
|
INSP - Framing/ Rough-in | 2/23/1998 | 2/23/1998 | 2/23/1998 | A | FAIL |
Russ Owen
|
|
|
besco faxed me information from stove manuf,also i have been in contact with stove pie manufacturer I have faxed besco my information.i have not yet approved this installation.
|
INSP - Framing/ Rough-in | 2/18/1998 | 2/18/1998 | 2/18/1998 | P | FAIL |
Russ Owen
|
|
|
02/18/98 407 - FROM 2-17
|
INSP - Framing/ Rough-in | 2/17/1998 | 2/18/1998 | 2/18/1998 | P | FAIL |
Russ Owen
|
|
|
02/18/98 407 - called lance and will meet him friday. 340 COULNT GET TO 2-17
|
INSP - Final | 2/12/1998 | 2/12/1998 | 2/12/1998 | P | CANC |
Russ Owen
|
|
|
as written on correction i will inspect at framing.
|
INSP - Final | 2/12/1998 | 2/12/1998 | 2/12/1998 | P | CANC |
Russ Owen
|
|
|
as written on correction i will inspect at framing.
|