Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberMEC98-00537
StatusFinaled
Name ADVANCED HEATING/COOLING INC
Site Address 7499 W OVERLAND RD
Project NameAMERITEL INNS
Customer Number 
ePlanReview 
Description
AMERITEL INNS MOTEL - HVAC PER BLD97-2918. INITIAL CERTIFICATE OF VALUE IS $129,000.00 DF 11/19/98-final cert. 421,263.00 pool heater and gas piping not included lh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final10/19/199810/19/199810/19/1998PPASS
DetailsAlan Hauser
10/19/98 350 - final, signed final occ card
INSP - Final10/19/199810/19/199810/19/1998PPASS
DetailsAlan Hauser
10/19/98 350 - final, signed final occ card
INSP - Final10/14/199810/14/199810/15/1998PPART
DetailsAlan Hauser
10/14/98 350 - all done except exhaust fan on roof
INSP - Final10/14/199810/14/199810/15/1998PPART
DetailsAlan Hauser
10/14/98 350 - all done except exhaust fan on roof
INSP - Conference10/13/199810/13/199810/13/1998 PASS
DetailsAlan Hauser
/ / 350 - went over building with contractor, gave list of things to f
INSP - Final9/18/19989/21/19989/21/1998APART
DetailsAlan Hauser
09/21/98 350 - 2nd and 3rd flr. hallways only, not elevator lobbies
INSP - Final9/18/19989/21/19989/21/1998APART
DetailsAlan Hauser
09/21/98 350 - 2nd and 3rd flr. hallways only, not elevator lobbies
INSP - Framing/ Rough-in9/1/19989/1/19989/2/1998PPASS
DetailsAlan Hauser
09/01/98 350 - partial r/i 4th floor towers mezinne ###-#### ok for cover, need to extend exhaust fan on roof
INSP - Conference8/17/19988/17/19988/17/1998 PASS
DetailsAlan Hauser
/ / 350 - meet with hvac contractor and engineer and went over correct need from engineer
INSP - Framing/ Rough-in8/13/19988/17/19988/17/1998APART
DetailsAlan Hauser
08/17/98 350 - 60# test for all mainlines in building, no drawings or si yet
INSP - Framing/ Rough-in8/13/19988/13/19988/14/1998PPART
DetailsAlan Hauser
08/13/98 350 - went over corrections with supt. and hvac foreman, meetin with mech. engineer
INSP - Conference8/13/19988/13/19988/13/1998 PASS
DetailsAlan Hauser
/ / 350 - talked to gary, will meet him first thing tomorrow a.m.
INSP - Framing/ Rough-in7/22/19987/22/19987/23/1998PPASS
DetailsAlan Hauser
07/22/98 350 - 4 rooms 1st flr. ok
INSP - Framing/ Rough-in7/22/19987/22/19987/22/1998 PART
DetailsAlan Hauser
/ / 350 - will check in a.m., couldn't get to it this afternoon
INSP - Framing/ Rough-in6/30/19987/1/19987/1/1998APASS
DetailsAlan Hauser
07/01/98 350 - partial r/i 4th floor north side/ ###-####
INSP - Framing/ Rough-in5/1/19985/4/19986/19/1998APART
DetailsAlan Hauser
no records
INSP - Framing/ Rough-in6/12/19986/12/19986/12/1998PPASS
DetailsAlan Hauser
06/12/98 350 - AMERI-TEL INN--PARTIAL R/I ON 3RD FLOOR--###-#### ANDY r/i 3rd flr. ok
INSP - Framing/ Rough-in6/4/19986/5/19986/5/1998APASS
DetailsAlan Hauser
06/05/98 350 - r/i ok for small rooms on 2nd flr, corrections made, stil at condensate drains
INSP - Framing/ Rough-in6/4/19986/4/19986/4/1998PFAIL
DetailsAlan Hauser
06/04/98 350 - some corrections in some rooms, 2nd flr. northwest wing, blower coil condensate drains are to be trapped, there are none
INSP - Framing/ Rough-in5/22/19985/22/19985/22/1998PPART
DetailsAlan Hauser
05/22/98 350 - pressure test ok, but no drawings of piping or size to be changed piping from approved drawings
INSP - Framing/ Rough-in5/21/19985/21/19985/21/1998PPART
DetailsAlan Hauser
05/21/98 350 - 4th flr. east wing ok for cover, left correction notice a discussed with project supt., things engineer needs to approve
INSP - Framing/ Rough-in5/4/19985/4/19985/4/1998 PASS
DetailsAlan Hauser
05/04/98 350 - 1,2,3rd flrs., guest rooms ok for cover, east wing
INSP - Framing/ Rough-in4/30/19985/1/19985/1/1998APART
DetailsAlan Hauser
05/01/98 350 - spent 3 1/2 hrs. with hvac and project supt. going over m gas piping, some questions to address or get answers monday