INSP - Final | 9/21/1998 | 9/21/1998 | 9/22/1998 | P | PART |
Wes Worcester
|
|
|
09/21/98 342 - PAT ###-####
|
INSP - Final | 9/21/1998 | 9/21/1998 | 9/22/1998 | P | PART |
Wes Worcester
|
|
|
09/21/98 342 - PAT ###-####
|
INSP - Framing/ Rough-in | 5/11/1998 | 5/12/1998 | 5/12/1998 | A | PASS |
Wes Worcester
|
|
|
05/12/98 342 - PAT/###-#### - GAS PRESSURE TEST ON BOILER FOR THE POOL O
|
INSP - Framing/ Rough-in | 2/25/1998 | 2/25/1998 | 2/25/1998 | P | PASS |
Wes Worcester
|
|
|
02/25/98 342 - northwest heating ###-#### and pressure test upstairs ok
|
INSP - Framing/ Rough-in | 2/23/1998 | 2/23/1998 | 2/23/1998 | P | NR |
Wes Worcester
|
|
|
02/23/98 342 - 3 FURN,3AC, GAS TEST,WH---PAT ###-####
|