INSP - Final | 5/12/1998 | 5/12/1998 | 5/13/1998 | P | PASS |
Alan Hauser
|
|
|
05/12/98 350 - this was final on 3/25/98 i think they called in wrong permit number
|
INSP - Final | 5/12/1998 | 5/12/1998 | 5/13/1998 | P | PASS |
Alan Hauser
|
|
|
05/12/98 350 - this was final on 3/25/98 i think they called in wrong permit number
|
INSP - Framing/ Rough-in | 3/24/1998 | 3/25/1998 | 3/25/1998 | A | PASS |
Alan Hauser
|
|
|
03/25/98 350 - final, phase 1, signed final occ.
|