INSP - Final | 6/10/1998 | 6/10/1998 | 6/10/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final, signed final occ
|
INSP - Final | 6/10/1998 | 6/10/1998 | 6/10/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final, signed final occ
|
INSP - Framing/ Rough-in | 6/10/1998 | 6/10/1998 | 6/10/1998 | P | PASS |
Alan Hauser
|
|
|
06/10/98 350 - r/i ok
|
INSP - Framing/ Rough-in | 5/22/1998 | 5/22/1998 | 5/22/1998 | P | PART |
Alan Hauser
|
|
|
05/22/98 350 - part r/i, need another inspection when grid and diffusers tile
|