INSP - Final | 6/25/1998 | 6/25/1998 | 6/25/1998 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - FNL -OK FINAL sign occ card
|
INSP - Final | 6/24/1998 | 6/24/1998 | 6/24/1998 | P | CANC |
Dave Lightfoot
|
|
|
06/24/98 337 - Scheduled by Hello!. Contact phone is [8901663]. unit 17 will be done 6/25/98
|
INSP - Final | 6/24/1998 | 6/24/1998 | 6/24/1998 | P | CANC |
Dave Lightfoot
|
|
|
06/24/98 337 - Scheduled by Hello!. Contact phone is [8901663]. unit 17 will be done 6/25/98
|
INSP - Framing/ Rough-in | 5/4/1998 | 5/5/1998 | 5/5/1998 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by Hello!.
|
INSP - Framing/ Rough-in | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PASS |
Dave Lightfoot
|
|
|
05/05/98 337 - Scheduled by Hello!. RGHN-OK ROUGH IN
|