INSP - Final | 5/28/1998 | 5/28/1998 | 5/28/1998 | P | PASS |
Alan Hauser
|
|
|
05/28/98 350 - pt ok, gas line ok to bury
|
INSP - Final | 5/28/1998 | 5/28/1998 | 5/28/1998 | P | PASS |
Alan Hauser
|
|
|
05/28/98 350 - pt ok, gas line ok to bury
|
INSP - Framing/ Rough-in | 5/11/1998 | 5/12/1998 | 5/12/1998 | A | NR |
Alan Hauser
|
|
|
05/12/98 350 - not ready, need to wrap underground pipe
|