INSP - Final | 7/2/1998 | 7/2/1998 | 7/2/1998 | P | PASS |
Alan Hauser
|
|
|
07/02/98 350 -
|
INSP - Final | 7/2/1998 | 7/2/1998 | 7/2/1998 | P | PASS |
Alan Hauser
|
|
|
07/02/98 350 -
|
INSP - Framing/ Rough-in | 7/1/1998 | 7/1/1998 | 7/1/1998 | P | PASS |
Alan Hauser
|
|
|
07/01/98 350 - pt ok
|
INSP - Framing/ Rough-in | 5/28/1998 | 5/28/1998 | 5/28/1998 | P | FAIL |
Alan Hauser
|
|
|
05/28/98 350 - pt failed, need to change size of gas piping on roof
|
INSP - Framing/ Rough-in | 5/26/1998 | 5/27/1998 | 5/27/1998 | A | FAIL |
Alan Hauser
|
|
|
05/27/98 350 - no work done
|
INSP - Framing/ Rough-in | 5/22/1998 | 5/22/1998 | 5/22/1998 | P | NR |
Alan Hauser
|
|
|
05/22/98 350 - called, contractor said check 1st of next week
|
INSP - Rough-in & Gas Pressure | 5/22/1998 | 5/22/1998 | 5/22/1998 | | NR |
Alan Hauser
|
|
|
/ / 350 - hasn't done gas piping because of rain
|