INSP - Final | 6/19/1998 | 6/22/1998 | 6/22/1998 | P | PASS |
Alan Hauser
|
|
|
06/22/98 350 - signed final occ
|
INSP - Final | 6/19/1998 | 6/22/1998 | 6/22/1998 | P | PASS |
Alan Hauser
|
|
|
06/22/98 350 - signed final occ
|
INSP - Framing/ Rough-in | 5/21/1998 | 5/21/1998 | 5/21/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - never heard back from hvac contractor
|
INSP - Framing/ Rough-in | 5/20/1998 | 5/21/1998 | 5/21/1998 | A | PART |
Alan Hauser
|
|
|
05/21/98 350 - partial rough-in no one around, called and left message with tml, to tell me what they wa looked at
|