INSP - Framing/ Rough-in | 6/15/1998 | 6/15/1998 | 6/15/1998 | P | PASS |
Jim Storey
|
|
|
06/15/98 301 - RGHN-OK ROUGH IN
|
INSP - Final | 6/8/1998 | 6/8/1998 | 6/8/1998 | P | PASS |
Jim Storey
|
|
|
06/08/98 301 - pressure test end of the day ###-#### Randy gas test ok
|
INSP - Final | 6/8/1998 | 6/8/1998 | 6/8/1998 | P | PASS |
Jim Storey
|
|
|
06/08/98 301 - pressure test end of the day ###-#### Randy gas test ok
|