INSP - Final | 7/30/1998 | 7/30/1998 | 7/30/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - not ready for final corrections on r/i
|
INSP - Final | 7/30/1998 | 7/30/1998 | 7/30/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - not ready for final corrections on r/i
|
INSP - Framing/ Rough-in | 7/29/1998 | 7/30/1998 | 7/30/1998 | P | FAIL |
Alan Hauser
|
|
|
07/30/98 350 - combustilble materials in r.a., abs and pvc pipes
|
INSP - Final | 7/24/1998 | 7/24/1998 | 7/24/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final, signed occ. card
|
INSP - Final | 7/24/1998 | 7/24/1998 | 7/24/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final, signed occ. card
|
INSP - Framing/ Rough-in | 7/22/1998 | 7/22/1998 | 7/22/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - no r/i, corrections not done, that were posted 7/17
|
INSP - Framing/ Rough-in | 7/21/1998 | 7/22/1998 | 7/22/1998 | A | CANC |
Jim Sly
|
|
|
07/22/98 316 - Done by Alan H.
|
INSP - Framing/ Rough-in | 7/17/1998 | 7/17/1998 | 7/17/1998 | | FAIL |
Alan Hauser
|
|
|
07/17/98 350 - half space covered with tile, missing exhaust fan 2 as pe
|
INSP - Framing/ Rough-in | 7/17/1998 | 7/17/1998 | 7/17/1998 | | CANC |
Dave Lightfoot
|
|
|
07/17/98 337 - R/I 2ND FLOOR/ BEN/ ###-#### 350
|