INSP - Final | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PASS |
Alan Hauser
|
|
|
08/26/98 350 - final, no card to sign
|
INSP - Final | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PASS |
Alan Hauser
|
|
|
08/26/98 350 - final, no card to sign
|
INSP - Final | 8/20/1998 | 8/21/1998 | 8/21/1998 | P | FAIL |
Alan Hauser
|
|
|
08/21/98 350 - no inspection of diff., tile is all in, left notice to pr one to meet me
|
INSP - Final | 8/20/1998 | 8/21/1998 | 8/21/1998 | P | FAIL |
Alan Hauser
|
|
|
08/21/98 350 - no inspection of diff., tile is all in, left notice to pr one to meet me
|
INSP - Rough-in & Gas Pressure | 7/15/1998 | 7/15/1998 | 7/15/1998 | | PART |
Alan Hauser
|
|
|
/ / 350 - r/i ok at attic, pt ok, need inspection of diff. hookups bef
|