INSP - Final | 11/1/1998 | 11/1/1998 | 11/1/1998 | | PASS |
Alan Hauser
|
|
|
10/29/98 350 - sherry ###-####
|
INSP - Final | 11/1/1998 | 11/1/1998 | 11/1/1998 | | PASS |
Alan Hauser
|
|
|
10/29/98 350 - sherry ###-####
|
INSP - Final | 10/27/1998 | 10/29/1998 | 10/29/1998 | P | PASS |
Alan Hauser
|
|
|
10/29/98 350 - sherry ###-####
|
INSP - Final | 10/27/1998 | 10/29/1998 | 10/29/1998 | P | PASS |
Alan Hauser
|
|
|
10/29/98 350 - sherry ###-####
|
INSP - Framing/ Rough-in | 8/11/1998 | 8/11/1998 | 8/11/1998 | P | PASS |
Jim Sly
|
|
|
P/T...# 031150 hone is [3899734].
|
INSP - Framing/ Rough-in | 8/10/1998 | 8/10/1998 | 8/10/1998 | P | CANC |
Alan Hauser
|
|
|
08/10/98 350 - to be done by #316
|
INSP - Framing/ Rough-in | 8/10/1998 | 8/10/1998 | 8/10/1998 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N...Need UL list tape, wrap gas line, support flex, repair
|