INSP - Final | 9/23/1998 | 9/23/1998 | 9/23/1998 | P | PASS |
Alan Hauser
|
|
|
09/23/98 350 - JACK HESTER-###-####-FN INSP=KEY ABOVE GARAGE DOOR
|
INSP - Final | 9/23/1998 | 9/23/1998 | 9/23/1998 | P | PASS |
Alan Hauser
|
|
|
09/23/98 350 - JACK HESTER-###-####-FN INSP=KEY ABOVE GARAGE DOOR
|
INSP - Framing/ Rough-in | 7/30/1998 | 7/31/1998 | 7/31/1998 | A | PASS |
Jim Sly
|
|
|
07/31/98 316 - JACK ###-#### ì
|
INSP - Gas pressure test | 7/30/1998 | 7/30/1998 | 7/30/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - pt ok
|
INSP - Framing/ Rough-in | 7/28/1998 | 7/28/1998 | 7/28/1998 | P | PART |
Alan Hauser
|
|
|
07/28/98 350 - r/i ok, pt failed
|