INSP - Final | 9/25/1998 | 9/28/1998 | 9/28/1998 | A | PASS |
Dave Lightfoot
|
|
|
09/28/98 337 - TONYA ###-#### FNL -OK FINAL
|
INSP - Final | 9/25/1998 | 9/28/1998 | 9/28/1998 | A | PASS |
Dave Lightfoot
|
|
|
09/28/98 337 - TONYA ###-#### FNL -OK FINAL
|
INSP - Final | 9/25/1998 | 9/25/1998 | 9/25/1998 | | CANC |
Dave Lightfoot
|
|
|
09/25/98 337 - tanya ###-#### after wheeler mec has their inspec to do inspection on mon
|
INSP - Final | 9/25/1998 | 9/25/1998 | 9/25/1998 | | CANC |
Dave Lightfoot
|
|
|
09/25/98 337 - tanya ###-#### after wheeler mec has their inspec to do inspection on mon
|
INSP - Final | 9/25/1998 | 9/25/1998 | 9/25/1998 | | CANC |
Dave Lightfoot
|
|
|
09/25/98 337 - tanya ###-#### after wheeler mec has their inspec to do inspection on mon
|
INSP - Final | 9/25/1998 | 9/25/1998 | 9/25/1998 | | CANC |
Dave Lightfoot
|
|
|
09/25/98 337 - tanya ###-#### after wheeler mec has their inspec to do inspection on mon
|
INSP - Final | 9/23/1998 | 9/23/1998 | 9/23/1998 | P | FAIL |
Dave Lightfoot
|
|
|
09/23/98 337 - TAWNIA ###-#### FOR FN INSP CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need havcpermit and inspection need approved plans on site need boiler combustion air
|
INSP - Final | 9/23/1998 | 9/23/1998 | 9/23/1998 | P | FAIL |
Dave Lightfoot
|
|
|
09/23/98 337 - TAWNIA ###-#### FOR FN INSP CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need havcpermit and inspection need approved plans on site need boiler combustion air
|
INSP - Framing/ Rough-in | 7/30/1998 | 7/31/1998 | 7/31/1998 | A | PART |
Dave Lightfoot
|
|
|
07/31/98 337 - DRAKE ###-#### partial hydronic inspec ok
|