INSP - Final | 11/1/1998 | 11/1/1998 | 11/1/1998 | | PASS |
Alan Hauser
|
|
|
10/29/98 350 - signed occ card
|
INSP - Final | 11/1/1998 | 11/1/1998 | 11/1/1998 | | PASS |
Alan Hauser
|
|
|
10/29/98 350 - signed occ card
|
INSP - Final | 10/28/1998 | 10/29/1998 | 10/29/1998 | A | PASS |
Alan Hauser
|
|
|
10/29/98 350 - Scheduled by Hello!. Contact phone is [3425516].
|
INSP - Final | 10/28/1998 | 10/29/1998 | 10/29/1998 | A | PASS |
Alan Hauser
|
|
|
10/29/98 350 - Scheduled by Hello!. Contact phone is [3425516].
|
INSP - Framing/ Rough-in | 10/8/1998 | 10/9/1998 | 10/9/1998 | A | PART |
Alan Hauser
|
|
|
10/09/98 350 - r/i ok, except couldn't find r.a. for furnace 2 as per pl
|
INSP - Framing/ Rough-in | 8/13/1998 | 8/14/1998 | 8/14/1998 | A | PART |
Alan Hauser
|
|
|
08/14/98 350 - r/i ok, no grid in, need smoke detectors at each unit as need inspection when grid is in
|